Hotel Construction specializes in the development, design and construction of high-quality hospitality establishments, ranging from boutique hotels to large luxury resorts. The company provides comprehensive services, including site assessment, architectural design, project management and construction, ensuring projects are completed on time, within budget and to the highest standards. With a focus on sustainability, innovation and guest experience,.

PROJEC NAEM:

MAKKAH-ALAZYZIAH -HOSPITALITY HOTEL PROJECT-BIN LADEN GROUP

PROJECT DURATION:

BRIEF PROJECT DESCRIPTION:

The project is a hotel building for the Ministry of Interior, consisting of five floors: a ground floor with a height of 9 meters, four additional floors, and a rooftop, with a total floor area of 2,250 m². It also includes underground water tanks for hotel use, irrigation, and fire safety, with an area of 450 m². Most of the building’s ceilings are made of 25 cm thick hollow-core slabs with a 5 cm thick reinforced concrete screed. The project also includes surrounding annexes (walls, entrances, and service rooms). The total project area is 13,250 m². Our work involved concrete and building construction.

PROJECT OWNER:

Ministry of Interior

2022 - 2023

PROJEC NAEM:

PROJECT OWNER:

SCOPE OF WORKS :

The project is a hotel residential building consisting of studio apartments for the guards. The building comprises five floors with a floor area of 1,250 m², and a total project area of 6,250 m². Our role in the project was the reinforced concrete works and building construction.

PROJECT DURATION:

SCOPE OF WORKS :

PROJECT OWNER:

BRIEF PROJECT DESCRIPTION:

The project consists of two hotel buildings, each with an area of 12,500 m², comprising five floors: a basement, a ground floor, three typical floors, and a rooftop. Each building contains 95 suites, four elevators, service and entertainment rooms, and distribution areas within the floors. Each suite consists of two, three, or four rooms with their respective services, totaling 556 rooms. The basements include entertainment halls, sports courts, parking spaces, and a main kitchen. Our work involved completing the concrete works and finishing, all with high-quality specifications

Dor Hotel PROJECT

RIYADH - Housing studios, Bin Laden Group

Ministry of National Guard

ALL CONCRETE WORKS

2011 - 2012

BRIEF PROJECT DESCRIPTION:

RIYADH - Tuwaiq SINGEL STAFF HOUSINGHOTELS PROJECT

DUR HOSPITALITY COMPANY

2017 - 2019

Completion of concret e works and all finishing works

PROJECT DURATION: